We have successfully completed projects throughout New Zealand, Fiji, Tonga, Samoa, Australia, and Hong Kong.
Uplifting existing Neuchatel, preparing substrate with floor grinders, applying Bituthene 5000 and overlaying with 50mm of asphalt.
Epoxy coating, concrete injection, joint sealing and concrete dust proofing to Watercare’s new chemical plant.
Tanking with Bituthene 3000 to masonry block walls, ramps and external planter boxes.
Warehouse floor joint repairs.
Applied Sika dust proofing to switch board room.
Sansom installed Mapeplan TU PVC membrane system on top of the Aotea Station tunnel roof. Membrane tested by ILD NZ prior to handover.
Floor joint upgrading.
Applied three coats of Sika 400 n system to walkways.
Applied Sika 400 n coating to the warehouse floor.
Grind wall and floor to remove old paint and concrete laitance. Apply primer coat lay mesh and apply two topcoats of Allnex Aquaguard 101.
Below ground tanking works fully encapsulating the basement and retaining walls.
Concrete repairs to areas of floor joints, corbels for seismic stability.