DATE OF PROJECT 2017
CLIENT St Cuthbert's College
HEAD CONTRACTOR Sansom Construction Systems Ltd
LOCATION Epsom, Auckland
1500m2 two layer butt joint membrane installed with our Mini-Macaden automated torch on membrane machine, which allows us to install torch on membrane at a much faster rate. We installed 3000m2 in six days with a five-man crew.