DATE OF PROJECT 2025
LOCATION AUCKLAND
Our role in this project was to install a FRP system for the seismic upgrade.
This included floor prep grinding, sealing, and fixing cracks in the floor, as well as laying carbon fibre strips and drilling and installing anchors.