DATE OF PROJECT 2016
CLIENT Auckland War Memorial Museum
LOCATION Auckland CBD
On this project we uplifted the existing asphalt and concrete and then removed the failed membrane from the roof of the underground carpark that is also the tourist bus drop off point for the museum.
We then ground and prepared the surface ready for the new Nuralite, Nuraply 3pc torch on system which was laid with our Mini Macaden torch on machine. Then a three layer asphalt system was relayed over the top of the membrane.