ARVIDA MAYFAIR – OTEHA VALLEY RD

DATE OF PROJECT 2024

LOCATION AUCKLAND

work completed

Installing the Sikaproof A+

A section of the existing ground floor was cut open to install new pipes to upgrade the building. After the pipes are installed and the new substrate is prepared, we will re-establish waterproofing along the cut floor with Sikaproof A+ and detail the new pipes coming through the membrane.

Our team will finish the section with the Waterbar along the Concrete cut and around the pipes.