NUGENT STREET CFRP

DATE OF PROJECT 2025

LOCATION AUCKLAND

work completed

Our role in this project was to install a CFRP system for the seismic upgrade.

This included floor prep grinding, sealing, and fixing cracks in the floor, all before the main job of laying carbon fibre strips and drilling and installing anchors.