AUCKLAND AIRPORT TRANSPORT HUB – FAÇADE

DATE OF PROJECT 2024

CLIENT ICON Construction NZ

LOCATION Ray Emery Drive, Māngere, Auckland

work completed

At the Auckland Airport Transport Hub, Sansom partnered with ICON Construction to deliver top-tier facade waterproofing solutions. Our comprehensive work included extensive sealant applications, seismic joint installations, and specialised waterproofing measures, ensuring long-term durability and protection for this key infrastructure project.

Contract Work:

  • Sealant Application: Sikahyflex 250 – 2805 LM
  • Sealant Application: Sika Fire 400 – 5397 LM
  • Seismic Joint: SIKA Emshield WFR2 – 1075 LM
  • Seismic Joint: SIKA Colorseal – 1075 LM
  • Sika Façade Baffle – 793 LM
  • Seismic Cover Plates & Soakers
  • RX101T Waterstop – 2098 LM

Variation Work:

  • Temporary Waterproofing
  • Solitex Adhere Sheet
  • Grouting
  • Sikalastic 152